Asphalt paving, sealcoating, repair and concrete around Dixon, CAAsphalt paving and concrete in Dixon, CA
Call or text (707) 396-7730 License #1162484
Trinity Paving and Concrete
Our Services

ADA Ramps in Dixon, CA

Concrete ramp with black handrails and edge curbs rising from a blue-striped accessible parking aisle to a building entrance, ADA ramps
ADA Ramps · Dixon, CA

Concrete ramps from the accessible stall to the door

Trinity Paving and Concrete pours concrete ADA ramps and curb ramps for business owners, churches, HOAs and landlords around Dixon. An ADA ramp is one link in the accessible route, the path from accessible parking to the entrance. We build that route in concrete: curb ramps, ramp runs, landings and the walks between them. When a ramp or walk is too steep, cracked or lifted, we tear it out and pour a new one.

ADA ramps are part of our concrete flatwork. We form each ramp to the slopes on the plan or the city's standard drawing. The building official, your designer or a CASp, a state-tested access specialist, decides whether a site complies. Call or text (707) 396-7730, and we look at the job and put the quote in writing.

What We Handle

  • Concrete ADA ramps with landings at the top and bottom of each run
  • Curb ramps at the parking lot curb and at the public sidewalk
  • Yellow detectable warning surfaces set at curb ramps
  • Walks on the accessible route kept at 1:20 or flatter
  • Ramp landings formed so winter rain does not pond
  • Tear-out and replacement of ramps and walks that are too steep, cracked or lifted
  • Ramp work timed with a parking lot repave or restripe
  • A written quote after we see the site

Request an ADA Ramps Quote

Tell us about the driveway, parking lot, private road or concrete work and where it is. We look at the job and put the quote in writing.

How Steep Can an ADA Ramp Be?

California's 2025 building code took effect on January 1, 2026. Its Chapter 11B covers public buildings, public accommodations and commercial buildings. Under it, an ADA ramp can be no steeper than 1:12, or 8.33 percent. So every inch of rise takes at least a foot of ramp.

Side to side, the ramp can slope no more than 1:48. Ramp runs must be at least 48 inches wide, wider than the 36 inches in the federal ADA Standards. One run can climb 30 inches at most, so a full-height run at 1:12 is 30 feet long. Each run needs landings at both ends: at least 60 inches long at the top and 72 at the bottom.

Concrete can vary slightly along a run, the US Access Board notes. Its guide recommends designing outdoor ramps at 7.5 percent running slope and 1.5 percent cross slope at most. That leaves room under the code limits for small variations in the finished concrete.

ADA Curb Ramps and Detectable Warnings at Your Lot

California's code calls for at least one accessible route from the accessible parking to the entrance. The public sidewalk and transit stops need a route to the entrance too. A walk on that route can slope no more than 1:20, or 5 percent. Any steeper, and it counts as a ramp.

A curb ramp has the same 1:12 limit, and its flared sides can be no steeper than 1:10. The landing at its top is at least 48 inches long. Within 24 inches of the ramp, the gutter and street slope no more than 1:20. Where the ramp meets the walk, gutter or street, the surfaces must be flush.

Curb ramps carry detectable warnings: a yellow surface of truncated domes, 36 inches in the direction of travel. The ramp and its flares must stay out of drive lanes, parking stalls and access aisles. We lay out ADA stalls and their access aisles as part of our parking lot striping.

Ramp Landings, Winter Rain and Permits Around Dixon

At NOAA's station near Davis, 84 percent of a normal year's rain falls from November through March. California's code says landings exposed to wet weather must be designed so water does not collect. A landing can slope no more than 1:48, about 2 percent. So we set the forms to carry rain off within that limit.

Dixon's handout on work exempt from permits includes sidewalks up to 30 inches above grade. That exemption leaves out walks that are part of an accessible route. Sidewalk and curb work in the public right-of-way takes an encroachment permit from Dixon's Engineering Department. In other towns, the city or county building office answers what your project needs, and we point you there.

Worker finishing a new concrete curb ramp and sidewalk with a detectable warning panel set in place, ADA curb ramp Fresh concrete walk with a yellow detectable warning tile where it meets the street, ADA ramps

Ready to get started?

Call or text for a written quote. We work about 40 miles around Dixon across Solano, Yolo and Sacramento counties.

(707) 396-7730
How We Work

How a Job With Trinity Paving Runs

From the first call or text to the finished work, here is how it goes.

1

Call or text

Call or text (707) 396-7730. Tell us what needs work and the town the job is in.

2

We look at the job

We come out to see the site and the surface that is there now. We also check the slope and where the water runs.

3

Your written quote

The quote comes to you in writing before any work starts. Once you say yes, we put the job on the schedule.

4

Grading and base work

On a replacement, the old asphalt is torn out and hauled off first. Then the ground is graded, and base rock goes down in compacted lifts.

5

The finished surface

The hot mix asphalt is laid and rolled, or the concrete is poured and finished. Parking lots get their striping, and the site is cleaned up.

FAQ

ADA Ramps Questions, Answered

Common questions about ada ramps around Dixon and the towns of Solano, Yolo and Sacramento counties. If yours is not here, call or text and ask.

Call (707) 396-7730

How much does an ADA ramp cost?
We price each ADA ramp after we see the site. The height the ramp has to climb sets its length, and every run needs landings. Tear-out of an old ramp, curb ramps, detectable warnings and work at the street add to the price. Call or text (707) 396-7730, and the quote comes to you in writing.
Can a cracked or lifted ADA ramp be repaired?
It depends on the damage. On an accessible route, California's code says a change in level over half an inch must be ramped. Cracked or lifted panels come out to the nearest joint or a clean saw cut, and new concrete goes in. A ramp that is too steep is torn out and poured again, longer and flatter.
Do ADA ramps need handrails?
Under California's code, ramp runs need handrails, with a few exceptions. Curb ramps, for one, do not need them. We pour the concrete ramp, its landings and the curb ramps. Handrails are another trade's work, so plan them with your designer.
Do you inspect our site for ADA compliance?
No. We pour concrete to the slopes on the plan or the city's standard drawing. A CASp is a specialist tested through the state's Division of the State Architect to inspect sites for compliance. Ask a CASp, your designer or the building official whether your site complies.
Does a repave or restripe mean our ramps must be fixed?
Under California's code, a resurface or restripe of an existing lot is limited to that scope of work. On its own, it does not trigger the code's path of travel rules for alterations. Your building official decides what a given project triggers. A cracked or too-steep ramp can still be replaced during the same commercial paving job.
More From Trinity Paving

Work That Pairs With ADA Ramps

New concrete slab along a block wall in a side yard, concrete contractor flatwork

Concrete Flatwork

Entry landings, curbs, gutters, slabs and pads for homes and businesses. We tear out broken flatwork and pour new concrete with a broom finish and control joints.

Learn More
Fresh white stall lines and a blue ADA access aisle in a parking lot, parking lot striping

Parking Lot Striping

We stripe new parking lots and restripe faded ones, including ADA stalls and fire lane markings. Striping is also the last step after we pave or sealcoat a lot.

Learn More
Two rollers compacting a new asphalt parking lot beside a metal building, commercial paving

Commercial Paving

Parking lots and commercial drives for offices, apartments, churches, business parks and farm yards, built from a graded base. We pave in sections so your business stays open.

Learn More
Why Choose Trinity Paving

Paving, Concrete and Grading Around Dixon

Asphalt and concrete under one company

The grading, the base, the asphalt or concrete and any retaining wall all come from us. One call covers the whole job.

Built from the base up

Every surface we build starts on a graded and compacted base. That base matters here: some lots around Dixon sit on clay that cracks when dry and swells when wet. The grade is shaped so water sheds off, and thickness follows the load.

A written quote after we see the job

We come out and look at the job before we price it. The quote comes to you in writing, with the work spelled out.

About 40 miles around Dixon

We are based in Dixon, on Interstate 80 between Vacaville and Davis. Our work reaches Woodland, Sacramento, Elk Grove and Vallejo, and the farm country between them.

Guides and Resources

ADA Ramps Guides

Request a Quote

Get In Touch With Trinity Paving

Tell us about the job and the town it is in. Call or text (707) 396-7730 or use the form, and we will get back to you.

  • Call or text (707) 396-7730
  • Serving Dixon, CA and Solano, Yolo and Sacramento counties
  • Written quotes · asphalt paving, concrete and grading

Request a Quote

Tell us about the driveway, parking lot, private road or concrete work and where it is. We look at the job and put the quote in writing.

Call (707) 396-7730